How a project with AiPow works.
It starts with a chat about the work that slows you down, on the phone or by video. Then we write down what we’d do: which chore to start with, what’s included, which AI we use, where your data goes and what it costs. We build it with the people who do the work, and a person in your company signs off.
Show us how you work.
No serious quote is written without a site visit. So before we suggest anything, you show us how you work.
How we listen
- We don’t bring a ready-made presentation to the first meeting.
- You show us the everyday sheets and files, just as they are.
- We talk with the people who do the work, because they know every step.
- We start with what slows you down.
How it starts.
Three steps, and after each one you decide whether to take the next.
The three steps
-
Tell us about your day.
A chat with no commitment, on the phone or by video. You tell us what slows you down and we do the hours count together.
-
We write down what we’d do.
Which chore to start with, what’s included and what isn’t, which AI we use, where your data goes, what it costs. Read it in your own time and decide.
-
We build it with your team.
It connects to what you already use: management software, Excel, email, WhatsApp. The people who work with you learn to check it and sign off, and we measure the time before and after together.
What we need from you.
One person who knows the work, and a little of their time.
What we ask of you
- At the start, a chat.
- One person who does the work and shows it to us with the everyday files, messy ones included.
- A sign-off at each trial run during the project. How much of your time we need is written in the proposal.
What’s in the proposal.
Before we start, we write everything down. If it doesn’t add up for you, you don’t sign.
The eight points of the proposal
- The chore we start with
- What the system prepares, and what stays with the people who work with you
- What’s included and what isn’t
- Which AI we use, where your data goes and the provider’s terms
- Who signs off, and on what
- How we measure the time before and after
- What stays yours when the work ends
- The price
What it costs, and how to pay.
The price is per project: it comes after the measurements, written line by line in the proposal.
What the price depends on
There’s no price list, because every job is different. Like a made-to-measure suit, the price comes after the measurements: first we look at the work, then we put it in writing.
The price depends on three things: how many steps the work has, which programs it needs to connect to, and how many different cases it has to recognise.
You pay per project, for the work agreed. The proposal also says what’s included and what isn’t.
If the hours count says it isn’t worth it, or if an export from your management software is all you need, we’ll tell you.
One step at a time.
The first chore made lighter is the first step. From there, the company climbs as far as it chooses.
A motor on a horse.
A motor on a horse moves at the horse’s pace, with extra weight. It changed everything once someone built a car around it.
Picture it: a motor mounted on a horse. The motor pushes, but the horse has its own legs, its own pace, its own road. You travel at the horse’s speed, carrying extra weight. The motor only changed everything when someone stopped thinking about the horse and built something new around it: the car. Then the roads changed, and the distances, and the whole idea of a journey.
AI is that kind of motor. Bolted onto the old way of working, it moves at the old pace. It pays off when the work is redesigned around what it can do, together with the people who do that work every day.
- A person on horseback, on a road full of bends. It’s the way it has always been done.
- Punto mounts a motor behind the saddle. The motor roars, but the pace is still the horse’s. And now there’s the weight of the motor too.
- The lines rearrange themselves into a car: something new, designed around the motor. The road straightens out. The same person is at the wheel, the horse sits in the back with its nose at the window, and Punto holds the map.
Rules we don’t bend.
You sign off. Like a form that’s already filled in: every field is written, but it only counts once you sign it.
What stays yours.
The proposal already says what stays yours when the work ends.
If one day we stop working together
In the proposal we write what stays yours and what stays ours in the software. The data is always yours.
Read it in your own time and show it to whoever looks after your company’s books, your accountant for example.
Start with what slows you down.
The first step is a chat. We’ll get back to you within one working day.